Get to know Chakabama better with 2 real example sentences.
Chakabama in a sentence
Context around Chakabama
- Average sentence length in these examples: 28.5 words
- Position in the sentence: 2 start, 0 middle, 0 end
- Sentence types: 2 statements, 0 questions, 0 exclamations
Corpus analysis for Chakabama
- In this selection, "chakabama" usually appears near the start of the sentence. The average example has 28.5 words, and this corpus slice is mostly made up of statements.
- Around the word, zunheboto stand out and add context to how "chakabama" is used.
- Recognizable usage signals include 25 km chakabama zunheboto road and constructing the chakabama zunheboto 0. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "chakabama" sits close to words such as aabb, aabria and aacha, which helps place it inside the broader word index.
Example types with chakabama
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
The 25 km Chakabama-Zunheboto road will be a two-lane hard-shoulder construction, by Engineering, Procurement, and Construction (EPC) mode. (21 words)
Ltd., the firm that is constructing the Chakabama-Zunheboto (0 to 50 km) highway, has retracted its earlier claim that the people of Thenyizu village, in Phek district, had stopped work on said stretch of road. (36 words)
Ltd., the firm that is constructing the Chakabama-Zunheboto (0 to 50 km) highway, has retracted its earlier claim that the people of Thenyizu village, in Phek district, had stopped work on said stretch of road. (36 words)
The 25 km Chakabama-Zunheboto road will be a two-lane hard-shoulder construction, by Engineering, Procurement, and Construction (EPC) mode. (21 words)
Example sentences (2)
Ltd., the firm that is constructing the Chakabama-Zunheboto (0 to 50 km) highway, has retracted its earlier claim that the people of Thenyizu village, in Phek district, had stopped work on said stretch of road.
The 25 km Chakabama-Zunheboto road will be a two-lane hard-shoulder construction, by Engineering, Procurement, and Construction (EPC) mode.