On this page you'll find 5 example sentences with Eirgrid. Discover how to use the word correctly in a sentence.
Eirgrid in a sentence
Context around Eirgrid
- Average sentence length in these examples: 22 words
- Position in the sentence: 2 start, 2 middle, 1 end
- Sentence types: 5 statements, 0 questions, 0 exclamations
Corpus analysis for Eirgrid
- In this selection, "eirgrid" usually appears near the start of the sentence. The average example has 22 words, and this corpus slice is mostly made up of statements.
- Around the word, manager, official and insists stand out and add context to how "eirgrid" is used.
- Recognizable usage signals include at the eirgrid official timing and auction by eirgrid. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "eirgrid" sits close to words such as aaas, aacc and aacs, which helps place it inside the broader word index.
Example types with eirgrid
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
John Lowry, project manager, EirGrid/EU-Sysflex. (7 words)
Fitzgerald pictured at the EirGrid Official Timing Sponsorship launch. (9 words)
Codling Wind Park, a joint venture between Fred Olsen Seawind and EDF Renewables, emerged as one of the winners of the milestone auction by Eirgrid. (25 words)
Charlie McGee, System Operational Manager at EirGrid, said: “As we enter the winter months our National Control Centre plays a critical role in balancing supply and demand, as seen with the peaks recorded in November. (35 words)
While EirGrid insists that the project is designed specifically to link up with the Kilkenny line, local people see it as a Trojan horse that will be used as a hub for wind farms. (34 words)
Codling Wind Park, a joint venture between Fred Olsen Seawind and EDF Renewables, emerged as one of the winners of the milestone auction by Eirgrid. (25 words)
Example sentences (5)
Codling Wind Park, a joint venture between Fred Olsen Seawind and EDF Renewables, emerged as one of the winners of the milestone auction by Eirgrid.
Charlie McGee, System Operational Manager at EirGrid, said: “As we enter the winter months our National Control Centre plays a critical role in balancing supply and demand, as seen with the peaks recorded in November.
Fitzgerald pictured at the EirGrid Official Timing Sponsorship launch.
John Lowry, project manager, EirGrid/EU-Sysflex.
While EirGrid insists that the project is designed specifically to link up with the Kilkenny line, local people see it as a Trojan horse that will be used as a hub for wind farms.