Wondering how to use Seqra in a sentence? Below are 4 example sentences from authentic English texts. .
Seqra in a sentence
Context around Seqra
- Average sentence length in these examples: 21.5 words
- Position in the sentence: 2 start, 1 middle, 1 end
- Sentence types: 4 statements, 0 questions, 0 exclamations
Corpus analysis for Seqra
- In this selection, "seqra" usually appears near the start of the sentence. The average example has 21.5 words, and this corpus slice is mostly made up of statements.
- Around the word, act and review stand out and add context to how "seqra" is used.
- Recognizable usage signals include as to seqra and adopt and review act seqra. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "seqra" sits close to words such as aaai, aani and aarne, which helps place it inside the broader word index.
Example types with seqra
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
The SEQRA review was conducted over approximately five months. (9 words)
SEQRA is quite clear that an EIS is required for a Type I or an Unlisted action, i.e. a significant change of this nature. (25 words)
The board voted to confirm itself as lead agency as to SEQRA and adopt a positive declaration which reflects the need for a full EIS. (25 words)
One of the resolutions before the board declared that the sale would have a negative impact for purposes of the state’s Environmental Quality Review Act (SEQRA). (27 words)
SEQRA is quite clear that an EIS is required for a Type I or an Unlisted action, i.e. a significant change of this nature. (25 words)
The board voted to confirm itself as lead agency as to SEQRA and adopt a positive declaration which reflects the need for a full EIS. (25 words)
Example sentences (4)
The SEQRA review was conducted over approximately five months.
One of the resolutions before the board declared that the sale would have a negative impact for purposes of the state’s Environmental Quality Review Act (SEQRA).
SEQRA is quite clear that an EIS is required for a Type I or an Unlisted action, i.e. a significant change of this nature.
The board voted to confirm itself as lead agency as to SEQRA and adopt a positive declaration which reflects the need for a full EIS.