Taqa is an English word starting with the letter T. With 2 example sentences you'll see exactly how it works in context.
Context around Taqa
- Average sentence length in these examples: 31 words
- Position in the sentence: 0 start, 1 middle, 1 end
- Sentence types: 2 statements, 0 questions, 0 exclamations
Corpus analysis for Taqa
- In this selection, "taqa" usually appears in the middle of the sentence. The average example has 31 words, and this corpus slice is mostly made up of statements.
- Around the word, operated stand out and add context to how "taqa" is used.
- Recognizable usage signals include bab al taqa al madiq and to the taqa operated p15d. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "taqa" sits close to words such as aabc, aacr and aacsb, which helps place it inside the broader word index.
Example types with taqa
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
The development required the installation of a 42 kilometres pipeline by Allseas from the Q10A location to the Taqa-operated P15d platform for export. (24 words)
Later, army units targeted with artillery fire and rockets the bases of terrorists in al-Hamra, Bab al-Taqa, al-Madiq castle, and al-Twaina in Hama’s northern countryside, inflicting losses upon them in personnel and equipment. (38 words)
Later, army units targeted with artillery fire and rockets the bases of terrorists in al-Hamra, Bab al-Taqa, al-Madiq castle, and al-Twaina in Hama’s northern countryside, inflicting losses upon them in personnel and equipment. (38 words)
The development required the installation of a 42 kilometres pipeline by Allseas from the Q10A location to the Taqa-operated P15d platform for export. (24 words)
Example sentences (2)
Later, army units targeted with artillery fire and rockets the bases of terrorists in al-Hamra, Bab al-Taqa, al-Madiq castle, and al-Twaina in Hama’s northern countryside, inflicting losses upon them in personnel and equipment.
The development required the installation of a 42 kilometres pipeline by Allseas from the Q10A location to the Taqa-operated P15d platform for export.