Get to know Vpt better with 2 real example sentences.
Vpt in a sentence
Context around Vpt
- Average sentence length in these examples: 36.5 words
- Position in the sentence: 1 start, 0 middle, 1 end
- Sentence types: 2 statements, 0 questions, 0 exclamations
Corpus analysis for Vpt
- In this selection, "vpt" usually appears near the start of the sentence. The average example has 36.5 words, and this corpus slice is mostly made up of statements.
- Around the word, telephone and equipped stand out and add context to how "vpt" is used.
- Recognizable usage signals include of the vpt equipped block and public telephone vpt will be. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "vpt" sits close to words such as aabc, aacr and aacsb, which helps place it inside the broader word index.
Example types with vpt
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
Under the Bharat Nirman Programme, the Government of India will ensure that 66,822 revenue villages in the country, which have not yet been provided with a Village Public Telephone (VPT), will be connected. (34 words)
Block III USS is first of the VPT-equipped Block III Virginias Overhead view of the Block III USS USS through approximately SSN-791 are planned to make up the Third Block or "Flight" and began construction in 2009. (39 words)
Block III USS is first of the VPT-equipped Block III Virginias Overhead view of the Block III USS USS through approximately SSN-791 are planned to make up the Third Block or "Flight" and began construction in 2009. (39 words)
Under the Bharat Nirman Programme, the Government of India will ensure that 66,822 revenue villages in the country, which have not yet been provided with a Village Public Telephone (VPT), will be connected. (34 words)
Example sentences (2)
Block III USS is first of the VPT-equipped Block III Virginias Overhead view of the Block III USS USS through approximately SSN-791 are planned to make up the Third Block or "Flight" and began construction in 2009.
Under the Bharat Nirman Programme, the Government of India will ensure that 66,822 revenue villages in the country, which have not yet been provided with a Village Public Telephone (VPT), will be connected.