On this page you'll find 2 example sentences with Wightfibre. Discover how to use the word correctly in a sentence.
Wightfibre in a sentence
Context around Wightfibre
- Average sentence length in these examples: 32 words
- Position in the sentence: 0 start, 2 middle, 0 end
- Sentence types: 1 statements, 0 questions, 1 exclamations
Corpus analysis for Wightfibre
- In this selection, "wightfibre" usually appears in the middle of the sentence. The average example has 32 words, and this corpus slice is mostly made up of statements.
- Around the word, ducts stand out and add context to how "wightfibre" is used.
- Recognizable usage signals include bt and wightfibre ducts lane and sound with wightfibre has finally. That gives this page its own corpus information beyond isolated example sentences.
- By corpus frequency, "wightfibre" sits close to words such as aabb, aabria and aacha, which helps place it inside the broader word index.
Example types with wightfibre
The same corpus examples are grouped by length and sentence type, making it easier to see the contexts in which the word appears:
After nearly five months, and hundreds of your attempts, Pounds for a Sound with Wightfibre has finally came to an end in November! (23 words)
Work to enable lane widening on Forest Road and facilitate the installation of high voltage cabling, BT and WightFibre ducts, lane widening work at the B&Q roundabout and Dodnor Lane and works to Medina Way have also been progressing well. (41 words)
Work to enable lane widening on Forest Road and facilitate the installation of high voltage cabling, BT and WightFibre ducts, lane widening work at the B&Q roundabout and Dodnor Lane and works to Medina Way have also been progressing well. (41 words)
After nearly five months, and hundreds of your attempts, Pounds for a Sound with Wightfibre has finally came to an end in November! (23 words)
After nearly five months, and hundreds of your attempts, Pounds for a Sound with Wightfibre has finally came to an end in November! (23 words)
Example sentences (2)
After nearly five months, and hundreds of your attempts, Pounds for a Sound with Wightfibre has finally came to an end in November!
Work to enable lane widening on Forest Road and facilitate the installation of high voltage cabling, BT and WightFibre ducts, lane widening work at the B&Q roundabout and Dodnor Lane and works to Medina Way have also been progressing well.